Our manifesto

Every space is a canvas: from the first line, through the workshop, to standing on site.

At a glance

Company
PT. Livindo Artha Gracia
Brand
Livindo Group
Founded
2009
Divisions
Exhibition & Booth, Thematic Decoration, 3D Character, Commercial Interior, Signage
Service scope
3D design, in-house workshop fabrication, delivery, installation, maintenance and dismantling
Office & workshop
Jl. Kp. Curug, Sangereng No. 32, Kelapa Dua - Gading Serpong, Tangerang, Banten 15180

Vision

To be the number one multi-specialist creative contractor in Indonesia blending high-precision structural engineering with world-class aesthetics.

Mission

  1. 01Delivering premium fabrication and construction with uncompromising safety standards.
  2. 02Providing schedule certainty and cost efficiency through self-owned 5,000 m² integrated workshops.
  3. 03Cultivating long-term partnerships built on integrity, transparency, and continuous innovation.

A solid team at every stage

  1. 01

    Pre-production

    Creative and drafting teams prepare optimal 3D concepts and working drawings.

  2. 02

    Production

    Fabrication in our in-house workshop under the supervision of a Project Controller.

  3. 03

    Delivery & installation

    Safe delivery and on-site installation led directly by an On-Site Supervisor.

Livindo Group in-house fabrication workshop with architectural woodworking and precision booth assembly

Our own workshop, full control over quality

Our office and workshop in Kelapa Dua, Gading Serpong handle every stage of a project, keeping quality and schedules under control from the first drawing to dismantling.

  • 3D design3D concepts and working drawings for approval before fabrication.
  • FabricationBuilt in our in-house workshop under a Project Controller.
  • DeliverySafe delivery of every component to the project site.
  • InstallationOn-site installation led directly by an On-Site Supervisor.
  • MaintenanceUpkeep while an installation is running, such as seasonal mall décor.
  • DismantlingTidy dismantling once the event or display period ends.

Our team

The people behind every project

From the first brief to dismantling, you work with the same team.

  • Hendra Siswanto

    Hendra Siswanto

    Managing Director

    Company direction & key client relations

  • Maya Anggraini

    Maya Anggraini

    Business Development Head

    Proposals, briefs & strategic brand partnerships

  • Reza Pratama, S.Ars

    Reza Pratama, S.Ars

    Lead 3D Designer

    3D visual design & architectural shop drawings

  • Budi Santoso, S.T.

    Budi Santoso, S.T.

    Project Controller

    Schedule, budget & production quality control

  • Agus Setiawan

    Agus Setiawan

    Workshop Head

    CNC fabrication, modular construction & spray booth finishing

  • Dedi Kurniawan

    Dedi Kurniawan

    On-Site Supervisor

    Site installation, work safety & final teardown

Track Record

15+yearscrafting landmark spaces for leading brands, retail malls, and luxury hotels across Indonesia.

Starting as an exhibition booth contractor in 2009, Livindo now commands five core disciplines with in-house design, manufacturing, and installation teams.

projects completed
500+
specialist divisions
5
year founded
2009
Production workshop with CNC machines and fabrication tables

The Livindo journey

  1. 2009

    Berdiri

    PT. Livindo Artha Gracia mulai sebagai kontraktor booth pameran.

  2. 2022

    Indonesia Comic Con

    Instalasi karakter untuk Indonesia Comic Con 2022 dan 2023.

  3. 2024

    Godzilla x Kong

    Instalasi atrium raksasa di Plaza Senayan.

  4. 2025

    Red Hulk

    Patung raksasa Captain America: Brave New World di Ratu Plaza.

  5. Kini

    Lima divisi

    Exhibition & Booth, Thematic Decoration, 3D Character, Commercial Interior, and Signage.

Clients

Trusted by leading brands, malls and hotels

Some of the names we have worked with.

  • Plaza Senayan
  • Senayan City
  • Ratu Plaza
  • Pacific Place
  • Ashta District 8
  • Gandaria City
  • Kota Kasablanka
  • Central Park
  • Mall Taman Anggrek
  • Mall Kelapa Gading
  • Mall of Indonesia
  • Lippo Mall Puri
  • PIK Avenue
  • Supermall Karawaci
  • Summarecon Mall Serpong
  • Mall Alam Sutera
  • Hotel Fairmont Jakarta
  • Grand Indonesia
  • Paramount Petals
  • Halte TransJakarta
  • Atrium Mall
  • Gading Serpong
  • Pullman Thamrin
  • JHL Solitaire
  • Wisma Nusantara

Our Process

From brief to final handover

A dedicated project controller accompanies you at every stage, eliminating multi-vendor coordination headaches.

Start Consultation
  1. Consultation & brief

    We analyze your commercial goals, budget parameters, schedule, and venue technical specs.

    • Site survey
    • Cost estimate
  2. 3D design & shop drawings

    Creative teams and drafters craft photorealistic 3D renders and build-ready engineering plans.

    • 3D renders
    • Shop drawings
  3. In-house workshop production

    Precision fabrication in our 5,000 m² workshop under strict QA/QC supervision.

    • Fabrication
    • Quality control
  4. Logistics, installation & maintenance

    On-site supervisor directs night-shift assembly, structural sign-off, live maintenance, and teardown.

    • Installation
    • Teardown

Have a project to bring to life?

Tell us what you need. Our team takes it from concept and 3D design to fabrication and on-site installation.

Type to search. Press Esc to close.